That is how we would open it. The endorsement is yours, and the argument above is the one we would put in front of the design authority. If the project needs a formal control room verification against ISO 11064, that is scoped work with operators in a mock-up, and we can point you towards someone who does it.
Twenty minutes, roughly. The problem is invented. The method is not.
